Skip Ribbon Commands
Skip to main content

Albert Einstein Charter ES

:

Albert Einstein AC ES WSM Phs1_GMP1 CZ21-077-24.A1

The Project consists of Make-Ready
Improvements preparing the site to facilitate the construction of Building D, a one-story mixed-occupancy structure housing Kindergarten Classrooms and a Multi-Purpose room, along with related Site and Building Improvements. PWCR#

   ​Albert Einstein Academies Charter ES                        PSA Specialist:
   3035 Ash Street, San Diego, CA 92101                      Maria Cruz   mcruz5@sandi.net   (619) 879-7870

    Pre-Job Meeting Dates:                                                           Bid ad:        04/26/22
        Tuesday       08/16/22                                                        Bid award:   07/26/22
        Wednesday  10/19/22
        Thursday     11/16/23                                                         Project value: $17,994,003.33
        Thursday     02/29/24​
  
  
  
  
collapse Document Types : _PJM Recording, Chat/Q&A, Minutes, Attendee List ‎(9)
2022-08-16 PJM 1_Albert Einstein Charter ES WSM Phase 1 GMP-1_ Attendees.docx
  
11/17/2023 1:06 PMCruz Maria
2022-08-16 PJM 1_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat Log.txt
  
11/17/2023 1:06 PMCruz Maria
2022-08-16 PJM 1_Albert Einstein Charter ES WSM Phase 1 GMP-1_Recording link.docx
  
11/22/2023 2:13 AMCruz Maria
2022-10-19 PJM 2_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat.txt
  
11/17/2023 1:05 PMCruz Maria
2022-10-19 PJM 2_Albert Einstein Charter ES WSM Phase 1 GMP-1_Recording link.docx
  
11/22/2023 2:11 AMCruz Maria
2023-11-17 PJM 3_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat (2).txt
  
11/17/2023 1:03 PMCruz Maria
2023-11-17 PJM 3_Albert Einstein Charter ES WSM Phase 1 GMP-1_Meeting Minutes.docx
  
11/22/2023 12:57 AMCruz Maria
2024-02-29 PJM 4_Albert Einstein Charter ES WSM Phase 1 GMP-1_Chat.txt
  
2/29/2024 12:32 PMCruz Maria
2024-02-29 PJM 4_Albert Einstein Charter ES WSM Phase 1 GMP-1_Recording link.docx
  
2/29/2024 4:11 PMCruz Maria
collapse Document Types : Bid Documents ‎(3)
Bid Ad for GMP-1_Albert Einstein AC ES Phs-1 WSM (Daily Transcript).pdf
  
7/29/2022 3:27 PMCruz Maria
Erickson-Hall List of Subcontractors.pdf
  
7/29/2022 3:39 PMCruz Maria
GC LOA_Erickson-Hall.pdf
  
7/29/2022 3:38 PMCruz Maria
collapse Document Types : Letter of Assent & Sub pre-job Forms ‎(74)
_Erickson-Hall (GC) PJC Form.pdf
  
1/11/2024 10:04 AMCruz Maria
A1 Fire  LOA - SPJ.pdf
  
1/10/2024 2:10 PMCruz Maria
Abdellatif LOA - SPJ.pdf
  
2/26/2024 12:40 PMCruz Maria
ACH Mechanical  LOA - SPJ (rev).pdf
Checked Out To: Cruz MariaACH Mechanical  LOA - SPJ (rev).pdf
Checked Out To: Cruz Maria
  
1/10/2024 2:11 PMCruz Maria
ACH Mechanical  LOA - SPJ (rev2).pdf
  
1/10/2024 2:19 PMCruz Maria
ACH Mechanical  LOA - SPJ.pdf
  
11/13/2023 6:55 AMCruz Maria
ACH tier Imperial Specialty LOA - SPJ.pdf
  
2/27/2024 5:53 PMCruz Maria
ACH tier Matrix Air Balancing LOA - SPJ.pdf
  
2/26/2024 12:51 PMCruz Maria
ACH tier Matrix Air LOA.pdf
  
1/10/2024 2:15 PMCruz Maria
ACH tier Matrix Air SPJ (rev1).pdf
  
1/10/2024 2:26 PMCruz Maria
Bayview Envir tier Bayview Demolition LOA and SPJ.pdf
  
11/13/2023 7:54 AMCruz Maria
Bayview Environmental LOA and SPJ (revision2).pdf
  
11/13/2023 7:55 AMCruz Maria
Bayview Environmental LOA and SPJ.pdf
  
11/13/2023 7:55 AMCruz Maria
CalCom Insulation  LOA - SPJ.pdf
  
1/10/2024 2:11 PMCruz Maria
Caston LOA - SPJ.pdf
  
4/5/2023 3:02 PMCruz Maria
Caston SPJ (rev).pdf
  
4/19/2023 10:18 AMCruz Maria
Cats Excavating LOA and SPJ.pdf
  
11/13/2023 7:55 AMCruz Maria
CATS tier Graham Cracker Demo LOA - SPJ.pdf
  
7/26/2023 2:53 PMCruz Maria
1 - 30Next